Status: Complete
Duration of work: 8 months
The property:
Original Floorplan - 3 bedrooms, 1 bathroom & 2 small receptions
New Floorplan - 5 Double bedrooms, 4 bathrooms , 2 large receptions and Kitchen Diner.
The client:
A professional couple with 3 children
The brief:
The property required planning permission for double storey side extension, rear extension and loft conversion.
Complete refurbishment, new electrical, under floor heating, mega floor system, new kitchen and bathrooms.
The challenge:
To create a modern family home without losing some of its characters obtaining planning for 5 bedrooms and insuring that the expenditure of the project does not exceed the current value of the property.
The project:
Kitchen:
The kitchen diner in the ground floor has been tiled with under floor heating. The Kitchen was designed and supplied by Lifestyle using Nolte German Range Kitchen
Bathrooms:
The master bedroom has en-suite bathroom with a shower and a bath tub.
Family shower room with wc was added to the loft and the first floor, and a cloakroom on the ground floor. All the bathrooms were designed and supplied by Lifestyle.